Tipper - The Critical Path - Used Vinyl Record 12 - P16293S
  £   31
  $   41

 


£ 31 Sold For
Jun 19, 2023 Sold Date
Jun 9, 2023 Start Date
1 Number Of Bids
  Great Britain Country Of Seller
eBay Sold at
 
save auction  

Description

About this Item

The item format is a vinyl 12"
uk, 1999, Format:Vinyl,12",45 RPM,Promo
The Artist Name is Tipper
The Title is The Critical Path
The Catalog Number is HG 039

Condition Used

Other Comments


The Media Condition is Near Mint

This disk is nearly perfect. It may have been played only a few times. It should play perfectly,


The Sleeve Condition is Very Good

This  sleeve may have  wear, it may have edgewear and the sleeve edge may have  splits, it may have visible circle wear or light wear and is likely to have some creasing. It could have, label wear, sellotape, stickers,  writing, or other minor visible issues.


The Tracks of this item include:
1. Seldom Vile 5:12
2. L.E.D Down 4:37
3. Twister 4:49
4. Sort Code 5:45


We Use Stock Images
Because we have over 2 million items for sale we have to use stock images, this listing does not include the actual image of the item for sale. The purchase of this specific item is made with the understanding that the image shown in this listing is a stock image and not the actual item for sale. For example: some of our stock images include stickers, labels, price tags, hyper stickers, obi's, promotional messages, signatures and or writing which may not be available in the actual item.


Vinyl Record disc  colour
Stock images can show a black, coloured, or picture disc. Unless a colour or picture  is explicitly described in this listing, this purchase is made with the understanding that it could be black or any colour, and or could be a picture disc.
 

Disc  Version
Vinyl discs  are released in many editions and variations, such as standard edition, re-issue, demonstration demo, not for sale, promotional promo, special edition, limited edition, and many other editions and versions.  The disc  you receive could be any of these editions or variations. If you are looking for a specific version or edition please contact us to verify what we are selling before you buy it.
 

The Outer Sleeve
When we describe the sleeve condition in this listing, we are describing the outer sleeve only, specifically, it does not describe the inner sleeve unless explicitly  referenced.
 

The Inner Sleeve
Almost all of our vinyl discs will include either an original inner sleeve, or a plain inner sleeve, or a printed inner sleeve, which we provide with the sole purpose of protecting the record. However, inner sleeves are notorious for being replaced or damaged, such as edge splits. Unless explicitly mentioned in this listing the inner sleeve is not considered as part of this purchase. If you purchase this Vinyl record it is with the clear understanding the inner sleeve is not included as part of this sale, and if a sleeve is included it is provided on an as/is condition solely as packaging, as a protector for the record, which may have creases, wear or edge splits.
 

Hairlines
If we reference a hairlines, it means it is a light line on the disc  that looks like a hair. Hairlines are  different to  scratches or wear. A  hairline is lighter and has limited and less impact on the playing quality, whereas wear or a scratch can  cause some level of clicks, pops or interference when  playing. 
 

Record Grading
Our Records are graded by the worldwide record industry standard  called the 'Record Grading 101: Understanding The Goldmine Grading Guide'. Search this term on Google if you have any queries about how sellers and collectors grade vinyl records.
 

Delivery Carrier and Courier Tracking
We use internal tracking codes when shipping goods.  If your item is not delivered within five days of dispatch you are welcome to contact us to track and resolve any delivery issues.
 

Gift Ideas
This is a  great  gift idea.
Fathers Day Gift Ideas

Hours of Service
We have many warehouses,  some of the warehouses process orders seven days a week, but the Administration Support Staff are located at a head office location, outside of the warehouses, and typically work only Monday to Friday.
 

Contact Us
Please contact us to check and verify the details of the item before purchasing if there is a specific image, edition, or variation you are looking for. If we have resources available we will share images.


Location ID 16293z

iHaveit SKU ID 136283851

Unique Reference Number 2087156591


price rating